11.04.2008

Day 2 of Work

Here is our livingroom, which was already torn up long before the plumber got a hold of it. In the 2.5 years we've lived here we've never had a livingroom, so it will be awesome to have this finished and opened up.
He tore out the ceiling to get to the pipes for the upstairs bathroom. He's going to replace those pipes so that we have some pressure in the tub to actually take a bath or a shower!
Here's the dining room ceiling opened up. I think that about broke Allan's heart since he had done all that hard work to get that room the way it is, (albeit not finished), but they'll fix it, so all's well!


This video is exactly the reason he's fixing the pipes. This is no exaggeration, this is what we've been dealing with for the last year. It was slightly better when we bought it, but by no means "good." I can't wait until I can take a shower and have the water BEAT me on the back. Woohoo!

It reminds me of this song...LOL

1 comment:

Gayle said...

I'm not sure you can even call that "water pressure". That's more of a water drip! I'm so glad you are getting it fixed!